Back
Next Post
Messana mControls platform installed to control this complex hydronic system with radiant floor heating and cooling
While we were out on the East Coast last week, we visited a job site in Charlotte, Vermont, for one of our upcoming projects with Sweeney DesignBuild!
This two-story home will utilize our Ray Magic® NK radiant ceiling panels to deliver radiant cooling and heating on the first and second floors. Meanwhile, a radiant floor will also be used for heating in the basement, managed by Messana mControls!
By utilizing our control platform, these homeowners will be able to fine-tune and monitor every aspect of their hydronic system within our easy-to-use web and mobile app!
This 6,976 sqft home in Palo Alto, CA, features three floors plus an ADU, with a complete hydronic heating and cooling system designed by Monterey Energy Group and managed by Messana Controls. Three Viessmann heat pumps, one serving each floor, generate heated and chilled water for a combination of radiant floor heating and cooling and Jaga hydronic fan coils.
This three-story, 7,000 sqft home features a sophisticated 11-zone hydronic system powered by two geothermal heat pumps. Messana Controls will manage heating and cooling throughout the home via a radiant ceiling, radiant floor, and Jaga Astrabeam hydronic fan coils, all working together as one integrated system.
Your form is being submitted, don’t close your browser.