Back
Clarum passive office building is moving fast: radiant cooling and heating panels are installed and pressure tested at 100psi.
This system utilizes three geothermal heat pumps to generate heated and chilled water for use within a radiant floor system for radiant heating and cooling. Additionally, Messana Controls was used to integrate with Mitsubishi VRF units to provide cooling!
Installed by the team at Warm Corp West, this mechanical room serves a 15,720 sqft residence in the Bay Area. The home's 4-pipe hydronic system utilizes a single air-to-water heat pump to generate chilled water for hydronic cooling, while two boilers produce hot water for hydronic heating.
Your form is being submitted, don’t close your browser.