Back
Next Post
Warm Corp West’s project progress photos were too good not to share! These install photos serve as a great example of our radiant ceiling panels being installed between metal furring channels, as opposed to wood!
This 24-zone, 7,000 sqft home in Napa, California, will utilize two air-to-water heat pumps to generate heated and chilled water for hydronic heating and cooling.
The system will use Messana Controls and Ray Magic® NK radiant ceiling panels will provide radiant cooling and heating, and a Messana Air Treatment Unit to provide both dehumidification and mechanical ventilation!
We can’t wait to see how this mechanical room comes out!
Installer: Warm Corp West
This 6,976 sqft home in Palo Alto, CA, features three floors plus an ADU, with a complete hydronic heating and cooling system designed by Monterey Energy Group and managed by Messana Controls. Three Viessmann heat pumps, one serving each floor, generate heated and chilled water for a combination of radiant floor heating and cooling and Jaga hydronic fan coils.
This three-story, 7,000 sqft home features a sophisticated 11-zone hydronic system powered by two geothermal heat pumps. Messana Controls will manage heating and cooling throughout the home via a radiant ceiling, radiant floor, and Jaga Astrabeam hydronic fan coils, all working together as one integrated system.
Your form is being submitted, don’t close your browser.