RAY MAGIC® NK panels installed on the ceiling by Lockwood Mechanical, Inc.

📍Location: Carmel, CA

The 2×8 radiant panels are installed between furring channels spaced 24 o.c. Lighting and ceiling features are easily placed between panels.

The RAY MAGIC® NK panels are easily connected with our patented fit-in technology. Once the radiant panels are installed and pressure tested, the drywall (typically 5/8″) is hung following standard practices.

The top 5 key components for an efficient hydronic radiant cooling system are the following:

  1. light thermal mass (drywall)
  2. ceiling installation
  3. dewpoint accurate sensor with smart control system
  4. dehumidification
  5. experience 🙂
[/vc_column_text][vc_row][vc_column width=”1/2″][vc_single_image image=”23163″ img_size=”535×670″][vc_empty_space][/vc_column][vc_column width=”1/2″][vc_single_image image=”23164″ img_size=”535×670″]

Leave a Reply

Your email address will not be published. Required fields are marked *


Please wait

Your form is being submitted, don’t close your browser.