Back

Radiant Floor Cooling and Heating in the Los Altos Hills

Los Altos Hills residence that utilizes Messana Controls to manage radiant floor cooling and heating.
Los Altos project that features a radiant floor and Messana air treatment units.
Pool house at Los Altos Hills Hydronic Heating and Cooling Project

We’ve just completed a system start-up for this beautiful Bay Area residence in the Los Altos Hills!

At 6,870 sqft, this home boasts seven bedrooms, five bathrooms, and standout features like a pool, pool house, gym, office, workshop, massage room, and media room!

Its advanced hydronic system includes three 5-ton SpacePak air-to-water heat pumps and a backup boiler, generating heated and chilled water for radiant floor heating and cooling. The energy sources are staged using a cascade method to optimize efficiency. Messana Controls and mSense comfort sensors enable the system to track the dew point temperature and adjust the radiant surface temperature accordingly, ensuring safe and effective radiant floor cooling.

Additionally, four Messana Air Treatment Units (ATUs) deliver mechanical ventilation, dehumidification, and supplemental heating and cooling.

Key components of this hydronic system include: Installer: Radiant Way Incorporated
Mechanical room with three mixing stations for hydronic heating and cooling via a radiant floor.
Three mixing stations to facilitate radiant floor heating and cooling, managed via Messana Controls.
Back up boiler for hydronic heating via a radiant floor. Managed via Messana Controls.
Three 5-ton SpacePak air-to-water heat pumps, generating heated and chilled water for radiant floor heating and cooling. The heat pumps are staged using a cascade method to optimize efficiency.

Leave a Reply

Your email address will not be published. Required fields are marked *


Please wait

Your form is being submitted, don’t close your browser.